Vulcan SquadVulcan Squad
← All projects

1889 Farms Cultivation Build-Out

Vulcan Squad built out cultivation and processing space for 1889 Farms, installing overhead lighting and irrigation drops in the grow rooms and finishing a dedicated processing room.

Project Gallery

Grow room with overhead LED light bar racks and irrigation drops along the back wall
Crew installing wall trim and finish work along the room perimeter
Finished processing room with stainless equipment and utility sink

From grow room infrastructure to a finished processing room, the build covered the full production flow.

Have a project like this?

Tell us about it and we’ll bring the same craftsmanship to your build.

Get a Quote