Vulcan SquadVulcan Squad
← All projects

610 Facility Build Out

Vulcan Squad handled the full facility preparation and build out for this indoor cultivation project, taking empty shell rooms through demolition, cleanup, electrical rough in, and mechanical installation.

Our crews ran conduit and junction boxes for lighting and controls, hung overhead ducting and circulation fans, and prepped every room for finishing. The photos below follow the build as each space came together.

Project Gallery

Electrical rough in with conduit and junction boxes
Conduit runs across grow room walls
Room prep with ceiling ducting in progress
Crew installing overhead ducting from scissor lift
Grow room with HVAC ducting and circulation fans installed
Grow room ready for finishing with door to corridor
Overhead equipment mounts and irrigation drops
Grow room walls with utility drops in place
Service corridor with mechanical systems
Staging area with racking and materials

Have a project like this?

Tell us about it and we’ll bring the same craftsmanship to your build.

Get a Quote